28TH JUN 2024
M-Bubble Bridge Plug delivers outstanding 266% OD transformation, enabling successful water shut-off in a subsea LWI project.

An international operator was experiencing increased water cut from a subsea well in the North Sea and had embarked on a production enhancement programme to remedy the issue. Following the acquisition of PLT logging data, the decision was made to isolate a lower section of the well and re-perforate above. The intervention would be performed from a light well intervention vessel using cable deployment. For this application, a high plug diameter transformation was required to navigate a narrow 3.256” restriction in the upper completion and set in the 7”, 32 lb/ft liner, at a deviation of 5°, holding a differential of 1,800-psi from below, with a well temperature of 110°C.
The M-Bubble bridge plug delivered successful isolation and water shut-off which was verified in a later PLT logging run.
You can find out more about this project in the attached case history or visit M-Bubble Plug to read about our innovative technology.